TECHNICAL BULLETIN TB-3081 Body Voltage Meter Installation, Operation and Maintenance A compliance verification plan shall be established to ensure the organizations fulfilment of the requirements of the plan. Process monitoring (measurements) shall be conducted in accordance with a compliance verification plan that identifies the technical requirements to be verified, the measurement limits and the frequency at which those verifications shall occur. The compliance verification plan shall document the test methods used for process monitoring and measurements. If the organization uses different test methods to replace those of this standard, the organization shall be able to show that the results achieved correlate with the referenced standards. Where test methods are devised for testing items not covered in this standard, these shall be adequately documented including corresponding test limits. Compliance verification records shall be established and maintained to provide evidence of conformity to the technical requirements. The test equipment selected shall be capable of making the measurements defined in the compliance verification plan. (EN 61340-5-1 clause 5.2.4) Figure 1. Desco 19431 Body Voltage Meter Packaging Description 1 Body Voltage Meter 1 Walking Test Probe The Desco 19431 Body Voltage Meter is a portable 1 Black 8-Pin DIN to USB Cable, 1.8 m long measuring system that allows analysis of charge levels 1 Black Ground Cord with Crocodile Clip, 5 m long accumulated on the human body according to ANSI/ 1 Lanyard with Hook ESD STM97.2. The Body Voltage Meter measurement 1 Certificate of Calibration may be logged using internal memory. Logged measurements can be exported and further reviewed on a PC. Graphs of measurements can be displayed on the LCD display for quick evaluation. Each Body Voltage Meter is calibrated with accepted procedures and standards traceable to the National Institute of Standards and Technology (NIST) and includes a NIST certificate. DESCO WEST - 3651 Walnut Avenue, Chino, CA 91710 (909) 627-8178 DESCO EAST - One Colgate Way, Canton, MA 02021-1407 (781) 821-8370 Website: Desco.com 2021 DESCO INDUSTRIES INC TB-3081 Page 1 of 6 September 2021 Employee OwnedA. Settings Button: Press to enter SETTINGS mode. Features and Components B. Left and Right Buttons: Press to cycle through the menus. C. Cursor Button: Press to advance the cursor. D. Exit Button: Press to power the meter ON and OFF. This button is also used to exit SETTINGS and MENU modes. E. Start / Stop Button: Press to start and stop a C measurement. This button is also used to increase the A D value of settings when in SETTINGS mode. F. Ground Jack: Common point ground for the meter. B B Connect the included black ground cord here. E G. Probe / PC Connector: Connect the included test probe when taking measurements. Connect the included DIN to USB cable when exporting data onto a PC. H. Ground Jack: Common point ground for the meter. Connect the included black ground cord here. I. Ground Touch Plate: Touch to ground the operator prior to taking body voltage measurements. Settings Mode Press and hold the Settings button for 1 second to enter F G H the SETTINGS mode. There are 4 menus available: 1. V RANGE 2. CLOCK 3. DISPLAY 4. C/F Press the Left button to move to the previous menu. Press the Right button to move to the next menu. Press the Exit button to exit from SETTINGS mode. V. Range Menu I Adjust the voltage range for new and saved graphs. Press the Cursor button to advance the cursor, and press the Start / Stop button to increase the value. NOTE: AUTO range is only available for saved graphs. Figure 2. Body Voltage Meter features and components DESCO WEST - 3651 Walnut Avenue, Chino, CA 91710 (909) 627-8178 DESCO EAST - One Colgate Way, Canton, MA 02021-1407 (781) 821-8370 Website: Desco.com 2021 DESCO INDUSTRIES INC TB-3081 Page 2 of 6 Employee Owned