2 Post and 4 Post Rack Standoff Brackets SPECIFICATION SHEET specifications The 2 and 4 post standoff brackets shall be made of steel and Rack Standoff Brackets will allow front offset mounting of 19 EIA horizontal managers, 1.6 front offset: RSB1A and equipment in a standard 2 or 4 post rack. The offset depths 2.9 front offset: RSB1B will be optimized to allow proper utilization of the PatchRunner 5.3 front offset: RSB1C High Capacity Vertical Managers finger spacing in each of the available rack mounting positions for the vertical manager. PatchRunner High Capacity Vertical Cable Managers Dual-sided 6 wide: PEV6* 8 wide: PEV8* 10 wide: PEV10* 12 wide: PEV12* Single-sided 6 wide: PEVF6* 8 wide: PEVF8* technical information 10 wide: PEVF10* 12 wide: PEVF12* Rack compatibility: All Panduit 2 or 4 post racks Optional Dual Hinged Doors Rack standoff depth: RSB1A : 1.6 front offset for PatchRunner High Capacity Vertical Cable 6 wide: PED6*B1 Manager mounted in fully back extended position on rack 8 wide: PED8*B1 RSB1B: 2.9 front offset for PatchRunner High Capacity Vertical Cable 10 wide: PED10*B1 Manager mounted in standard mounting position on rack 12 wide: PED12*B1 RSB1C: 5.3 front offset for PatchRunner High Capacity Vertical Cable NetManager High Capacity Manager mounted in fully forward extended position on rack Horizontal Cable Managers Installation: The standoff brackets are attached to both the left and right equipment rail 19 front and rear at the same RU. 1 RU manager: NM1 2 RU manager: NM2 Material: 16 gage steel, black powder coat finish 3 RU manager: NM3 4 RU manager: NM4 19 front only 1 RU manager: NMF1 key features and benefits 2 RU manager: NMF2 3 RU manager: NMF3 Specifically designed Positions equipment and horizontal managers at the proper depth with 4 RU manager: NMF4 for equipment and regard to the vertical manager fingers to allow maximum finger horizontal managers space utilization 2 Post Racks Designed to work with Designed to work with the PatchRunner High Capacity Vertical Cable 3 Channel racks 12-24 Panduit vertical cable Managers at each of the available installation depths threaded rail, managers numbered up: 45 RU: R2P Improves aesthetics Positions doors of the vertical and horizontal managers at the same depth 52 RU: R2P96 of the cable on the rack, increasing system aesthetics 42 RU: R2P79 management system 24 RU: R2P48 Through hole allow Through holes in brackets allow easy installation to rack without interfering 6 Channel rack 12-24 easy installation with equipment above or below the bracket installation RU threaded rail, numbered up: 45 RU: R2P6S 52 RU: R2P6S96 4 Post Racks applications Deep finger vertical managers require that the PatchRunner High Capacity Vertical Cable 7 version 30 depth horizontal managers and strain relief products Manager and provide the proper rack standoff threaded rail 12-24: R4P* are installed at the proper depth to be effective. clearance for horizontal managers, equipment, Cage nut rail: R4PCN* Panduit rack standoff brackets for 2 and 4 post and strain relief products. Other applications 7 version 23 depth racks allows increased flexibility for rack and cable include using the standoff brackets in conjunction threaded rail 12-24: R4P23* management systems by allowing proper front with 1, 2, 4, or 8 RU metal blanking panels as a Cage nut rail: RP23CN standoff positioning of equipment or horizontal way to protect power or communications cables 7 version 36 depth managers and strain relief products. Three depths that extend outside the rack. threaded rails 12-24: R4P36* were designed to match the mounting locations of Cage nut rail: RP36CN* 7 version 42 depth threaded rails 12-24: R4P42* Cage nut rail: R4P42CN* Rack Filler Panels 1 RU: DPFP1 2 RU: DPFP2 4 RU: DPFP4 8 RU: DPFP8 www.panduit.com *Add suffix 96 to the end of the part number for 8 Part Numbers. 2 Post and 4 Post Rack Standoff Brackets applications Used in conjunction with Used to position horizontal a 1, 2, 4, or 8 RU rack cable managers at the filler panel, the standoff proper depth, the standoff brackets can be used to brackets provide the proper create a barrier to protect rack standoff clearance for protruding power cords the horizontal cable or cables. managers. RSB1A: 1 RU Rack Standoff Bracket 1.6D from Rack 1.7 44 0.8 1.6 41 20 RSB1B: 1 RU Rack Standoff Bracket 2.9D from Rack 1.7 44 0.8 2.9 74 20 RSB1C: 1 RU Rack Standoff Bracket 5.3D from Rack 1.7 44 0.8 5.3 135 20 Dimensions are in inches. Dimensions in brackets are metric WORLDWIDE SUBSIDIARIES AND SALES OFFICES PANDUIT CANADA PANDUIT EUROPE LTD. PANDUIT SINGAPORE PTE. LTD. PANDUIT JAPAN PANDUIT LATIN AMERICA PANDUIT AUSTRALIA PTY. LTD. Markham, Ontario London, UK Republic of Singapore Tokyo, Japan Guadalajara, Mexico Victoria, Australia cs-cdn panduit.com cs-emea panduit.com cs-ap panduit.com cs-japan panduit.com cs-la panduit.com cs-aus panduit.com Phone: 800.777.3300 Phone: 44.20.8601.7200 Phone: 65.6305.7575 Phone: 81.3.6863.6000 Phone: 52.33.3777.6000 Phone: 61.3.9794.9020 For a copy of Panduit product warranties, log on to www.panduit.com/warranty For more information 2016 Panduit Corp. ALL RIGHTS RESERVED. Visit us at www.panduit.com RKSP121--WW-ENG Contact Customer Service by email: cs panduit.com Replaces WW-RKSP85 or by phone: 800.777.3300 12/9//2016