RCPS-100-70 04 OCT 19 Rev K Installation Procedure for Standard SolderSleeve Shield Terminators 1.0 SCOPE: This standard covers the installation procedure and inspection requirements for terminating cable shields to ground leads using Tyco Electronics SolderSleeve shield terminators. The TE Connectivity part numbers covered by this document includes: S01, S02, S03, SO63, SO96, SO175, ST18, ST63, D-104, D-108, B-013 and B-023. 2.0 REFERENCES: 2.1 TE Connectivity Instructions: 1. Operating instructions for the heating device used. 3.0 APPLICATION EQUIPMENT: TE Connectivity approved heat sources must be used to install these devices. The heater must be equipped with the recommended reflector to concentrate the heat and protect surrounding materials from damage. 4.0 TERMINATION PROCEDURE: Unless otherwise noted on the Specification Control Drawing for the shield terminator being used, the following procedures shall be used for all SolderSleeve shield termination devices. WARNING Follow installation instructions carefully. Use adequate ventilation and avoid charring or burning during installation. Charring or burning the product will produce fumes that may cause eye, skin, nose and throat irritation. Consult Material Safety Data Sheets RAY5103 or RAY5104 for further information. 4.1 Ground Lead Preparation: (if using lose ground leads). 1. Remove 1/4 to 5/16 inch of the insulation from the end of the ground lead as shown. Unless otherwise specified dimensions are in millimeters. (Inches dimensions are in between brackets) 2016- 2019 TE Connectivity Ltd. family of companies. 1 of 11 All Rights Reserved. Indicates Change *Trademark. TE Connectivity, TE connectivity (logo), and TE (logo) are trademarks. Other logos, product, and/or company names may be trademarks of their respective owners. RCPS-100-70 2. Inspect wires to ensure that the strands lie flat in their normal lay, with no loose strands poking out. This can be achieved by semi-stripping and twisting the insulation slug off by hand as shown below: 4.2 Cable Preparation: 4.2.1 Center Strip Remove 1/4 to 5/16 inch of cable jacket at the desired termination point as follows: 1. Score the jacket around the cable in two places, 1/4 to 5/16 inch apart. 2. Score the jacket between the cuts. 3. Remove the section of jacket. Unless otherwise specified dimensions are in millimeters. (Inches dimensions are in between brackets) Rev K 2 of 11